Transport Infrastructures

Transport Infrastructures

Railways & Highways

  • Study Design, Construction Supervision, Financing and Maintenance of works for the Rehabilitation and Widening of the Pan American Highway Stretch: Vigui – San Felix. Year-2013-2016
  • Control & Monitoring contract corresponding to (Design report/audit /supervision/construction control /inspection) of the works included in the Multiannual Investment Plans of the Excellent Provincial council of Cordoba Year: 2009-2015
  • Control & Monitoring contract corresponding to Design report audit/Supervision/construction control/ Inspection of Highways 31-BU- 4240, 32-BU-3720, 32-BU-4210, 32-BU-4220, BU-4320- 32, 33-BU-4170, BU-4270-33, 33-BU-4340, BU-34-4330, 35-BU-3770 and BU-4010-39. Record: 30.264/08 2. Key: A1G-595/08. Year: 2010-2015
  • Design, Construction Supervision and Maintenance for Widening Highway La Villa – Las Tablas in the Province of Los Santos in the term of 2012-2014.
  • Control and Surveillance Contract (corresponding to interventory / supervision / design / inspection) of several key works: 32-BU-3650; 32-BU-4070; 32-BU-4080; 32-BU-41 80; 33- BU-3630; 33-BU-3850; 33-BU-3960; 38-BU-4060; 38-BU-4090; 39-BU-3920; 39-BU-41 20 and 39-BU-4130 Year-2007-2013
  • Quality control (corresponding to Design Report /Audit/Supervision/ Construction control / Inspection) of the Highway works and Urbanization Infrastructures private initiative in the Municipality of Malaga Year-2012-2014
  • Control and Monitoring of the works: “Highway of the Mediterraneo, CN-340 of Cadiz and Gibraltar to Barcelona, Section: Algarrobo – Frigiliana. (Province of Malaga).,Spain
  • Design Consultancy and Technical Assistance for followup of the quality of the construction works: sections of the New Railway access of the Bobadilla-Granada High Speed line AV 017/06
  • Consultancy for Design & Supervision and Technical Assistance contract for conducting audits, quality monitoring, geometric control and contrast tests in the works of platform of the New Railway access of the High Speed Line Noroeste, Section: Girona – Figueres “(File: AV023 / 06)

 

  • Consultancy Services for Authority’s Engineer for Supervision Design and Construction of Delhi – Meerut Expressway (Package-IV) from Dasna to Meerut- Km. 27.740 of NH-24 to Km. 51.975 of NH-58 (Design Chainage 28+000 to 59+777) in the state of Uttar Pradesh on EPC Basis (Length 31.777 Kms)
  • Consultancy Services for Authority’s Engineer for Supervision of Project of Construction of four laning of Hisar to Dabwali section of NH-10 from km 170.000 to km 227.000 with paved shoulder in the state of Haryana on Engineering Procurement and Construction (EPC) Basis (Package-1). Year-2015-2018
  • Consultancy Services for Authority’s Engineer for Supervision of four laning of Hisar to Dabwali Section of NH- 10 from km 227.000 to km 314.660 with paved shoulder in the state of Haryana on Engineering Procurement and Construction (EPC) basis (Package-2) Year- 2015-2018
  • Consultancy services for Authority’s Engineer for Supervision of 2-Lane With Paved Shoulder from Jind-Gohana Section from Km 0+000 to Km 50+505 of NH-352A in the State of Haryana under NH (O) on EPC Mode
  • Consultancy services for Authority’s Engineer for Supervision of 2-lane with paved shoulder for Jind-Karnal Section from existing km 68+660 (Designkm 68+857) i.e. Junction with Narwana road (NH- 352) at Subhash Chowk and ends at km 153+700 (Design km 154+219) at ITI Chowk which is intersection with NH-1 of NH-709A in the State of Haryana under NH (O) on EPC mode (Package-II)
  • Consultancy Services for Authority Engineer for Rehabilitation and upgradation to 2-Lane with Paved shoulder for Bhiwani-Mundal Jind Road from Design Chainage Km 6+875 to km 68+857 (Length 61.982 km) of NH-709 A in the Stata of Haryana under NH (O) (Package-I)
  • Consultancy Services for Authority Engineer for Supervision of Rehabilitation and Augmentation of New NH-354(Old SH-21) of section Khemkaran Town to Start of Amritsar Bypass from Design Chainage KM- 22.673(Existing KM- 65.477 of SH) to Design Ch. KM- 71.496 (Existing KM- 16.351 of SH) for Length of 48.8223 Km. into Two Lane with the paved shoulder/Four-Lanning under Bharatmala Scheme in state of Punjab on EPC Mode (Package-II)
  • Independent Engineer services for “Up -gradation of four lane of Rewari – Ateli Mandi section of NH- 11 from km 11.780 to Rewari to EX. Km 43.445 near Ateli Mandi (designed length 30.45 km) as feeder Route in the state of Haryana on Hybrid Annuity Mode”: Package-III.
  • Consultancy Services for Authority’s Engineer for Supervision of Rehabilitation and Augmentation of New NH-354 (Old-SH-25) of Section Ramdas to Gurdaspur from Design Chainage Km 140.000 (Existing Km 46.320 of SH) to Design Chainage Km 187.492 (Existing Km 3.185 Of SH) for length of 47.492 Km into two with paved shoulder /four-lane under Bharatmala Scheme in the State of Punjab on EPC Mode (Package-V) Length 49 km
  • Consultancy services for Authority Engineer Services for Supervision of 4 laning of existing two lanes with paved shoulder road from Talwandi Bhai to Ferozepur NH-5 (Old NH-95) from Km 170.380 to Km 194.040 in the state of Punjab on EPC Mode
  • Consultancy Services for Authority Engineer for Supervision of Construction of Emergency Landing Facility from Km. 246+200 to Km. 249+700 (Design Length 3.5 Km) on Srinagar-Banihal Section of NH-1A (New NH-44) in the state of Jammu and Kashmir on EPC Mode
  • Consultancy services for Independent Engineer for supervision of Six laning of Anandapuram – Pendurthi – Anakapalli section NH 5 (New NH 16) from Km 681.000 to Km 731.780 (existing Km 742.400) (Design Length = 50.780 Km) in the state of Andhra Pradesh under Bharatmala Pariyojana on Hybrid Annuity Mode
  • Consultancy Services for Independent Engineer for supervision of Four laning of NH-363 from Mancherial (Design Km 0.000 /Existing Km 251.900) to Repallewada (Design Km 42.000/Existing Km 288.510) (Design Length = 42.000 Km) in the State of Telangana under NHDP Phase-IV under Bharatmala Pariyojana on Hybrid Annuity Mode
  • Consultancy services for Independent Engineer for supervision of four laning of NH-161 from Ramsanpalle (Design Km 39.980/Existing Km 44.757) to Mangloor (Design Km 86.788/Existing Km 91.350) (Design Length =46.808 Km) in the State of Telangana under Bharatmala Pariyojana on Hybrid Annuity Mode
  • Strengthening and widening to 2 lane With Paved Shoulder from km. 142.050 to 167.465 Of NH – 120 (Goh – Daudnagar) in the state of Bihar (25.415km) on EPC Mode. (JOB NO.-120-BR-2017-18/913) Strengthening and widening to 2 lane With Paved Shoulder from km. 0.000 to 10.800 Of NH – 219 (Mohania-Bhabhua) in the state of Bihar (10.80 Km) on EPC Mode. (JOB NO.-219-BR-2017-18/914) Construction of RCC Minor Bridge in Replacement of Existing Narrow and Old Damage Bridge in KM 02, 14, 40 & 43 of NH – 333 in the State of Bihar
  • Update, Validication, Complementation and Improvement of the Perversion Technical Design for the Construction of the Joya- Chuquichambi and Huayllamarca-Totora Asphalting Project. Year 2017.
  • Design works for the contracts listed below: • Draft highway road Rehabilitation of the Cerro Sombrero-Chichica Road, design Chichica -Cerro Miel-sorrow-Liano Tugri. Panama(19.73Km) • Draft of the Rehabilitating and Widening the Highway Pedregal – Gonzalillo- Transistmica.(9.42 Kms) • Draft the Guabal Highway Road-Rio San Luis- Calovebora. (31 kms) • Draft Rehabilitation of Highway roads in the provinces of Veraguas, Chiriqui and Ngobe Bugle. (12 km). • Study, Design and Construction of the Highway Road Carrentera Panamericana– Lajero-Cerro Puerco (18 Kms) • Draft Admiral Changuinola (Antigua train route) zvvsmmmmmhighway roads and paths: Valle Risco Valley Risco Risco-East , ValleyRisco-Nance Risco in the province of Bocas del Toro.
  • Design for Rehabilitation and Widening of the Pan American Highway Section: Viguà – San Felix.
  • Design for Rehabilitation and widening of the Pan American Highway. Section: San Felix San Juan Year :2008-2013
  • Control and Surveillance Contract (corresponding to interventory / supervision / design / inspection) of several key works: 32-BU-3650; 32-BU-4070; 32-BU-4080; 32-BU-41 80; 33- BU-3630; 33-BU-3850; 33-BU-3960; 38-BU-4060; 38-BU-4090; 39-BU-3920; 39-BU-41 20 and 39-BU-4130 Year-2007-2013

 

 

 

 

  • Final location survey using Digital Terrain / Elevation Model (DTM/DEM/DSM) generated from satellite or LiDAR imageries, staking of alignment on ground, Geological & Geophysical mapping & Geo-Technical investigations, planning & design of tunnels, bridges / viaducts & other structures, preparation of plans & detailed estimate etc. in connection with Silapathar – Bame – Along BG single Railway line.
  • Final location survey using Digital Terrain / Elevation Model (DTM/DEM/DSM) generated from satellite or LiDAR imageries, staking of alignment on ground, Geological & Geophysical mapping & Geo-Technical investigations, planning & design of tunnels, bridges / viaducts & other structures, preparation of plans & detailed estimate etc. in connection with Misamari (Bhalukpong) – Tenga – Tawang BG single Railway line.(approx. length- 180 Km.)
  • Consultancy Services for preparation of DPR including Project Management in the state of Chhattisgarh:– Package 01) Year :2015-2017
  • Consultancy Services for Preparation of feasibility study of two-laning of (i) Km. 0 to Km. 200 of SH-20 comprising the section from Sikar to Nokha (the “Highway-I”); (ii) Km. 0 to Km. 113 of SH-41 comprising the section from Fathepur to Rajgarh (the “Highway-II”); (iii) Km. 0 to Km. 144 of SH-60,SH-20,SH-19 comprising the section from Nagaur to Salasar (the “Highway-III”); and (iv) Km. 0 to Km. 71 of MDR-05 comprising the section from Bikaner to Jasrasar (the “Highway-IV”) totalling 528 Kms. (the “Project”) through Public Private Partnership (the “PPP”) on Design, Build, Finance, Operate and Transfer (the “DBFOT”) basis under Package-V
  • Preparation of feasibility study of two-laning of (i) Borawas to Kaludi length 38 Km (the “Highway-I”); (ii) Mundara to Desuri length 28 Km of SH-16 (the “Highway-II”); (iii) Deoli to Kanwas length 10 Km (the “Highway-III”); and (iv) Kapren to Baran length 70 Km of SH -37A (the “Highway-IV”) totalling 146 Kms. (the “Project”) through Public Private Partnership (the “PPP”) on Design, Build, Finance, Operate and Transfer (the “DBFOT”) basis under Package-EWS-S
  • Consultancy Services for Feasibility study for Two-laning of (i)  comprising section from Mandrayal to Karauli (the “Highway-I”); (ii) Sikendra- Gangapur comprising the section ftrom Sikandra to Gangapur(the “Highway-II”); (iii) Dholpur to Rajakhera Border comprising the section from Dholpur to Rajakhera (Border) (the “Highway-III”); (iv) Mahwa-Lakshmangarh upto SH-14 comprising the section from Mahwa to SH-14 (the “Highway-IV”); totalling (the “Project”) through Public Private Partnership (the “PPP”) on Design, Build, Finance, Operate and Transfer (the “DBFOT”) basis under Package 13
  • Preparation of feasibility study of two-laning of (i) Arai – Sarwar comprising the section from Arai to Sarwar (the “Highway-I”); (ii) Beawar – Gulabpura comprising the section from Beawar to Gulabpura (the “Highway-II”); (iii) Beawar – Pisangan – Tahla comprising the section from Beawar to Tahla (the “Highway-III”); (iv) Phalodi – Nagaur comprising the section from Phalodi to Nagaur (the “Highway-IV”); (v) Kuchaman – Renwal – Kishangarh comprising the section from Kuchaman to Kishangarh (the “Highway-V”); (vi) Talanpur – Dhanapa –Kawaspura (Mining) comprising the section from Talanpur to Kawaspura (the “Highway-VI”) and (vii) Tahla – Kod – Alaniawas – Govindgarh – Puskar (Mining) comprising the section from Tahla to Puskar (the “Highway-VII”) totalling 30 Kms. (the “Project”) through Public Private Partnership (the “PPP”) on Design, Build, Finance, Operate and Transfer (the “DBFOT”) basis.).” (Package-12)
  • Consultancy Services for Preparation of feasibility report of two-laning of (i) Bidasar – Sri Dungargarh – Kalu comprising the section from Bidasar to Kalu (the “Highway-I”); (ii) Sadulshahar – Sangaria – Chaiyan comprising the section from Sadulshahar to Chaiyan(the “Highway-II”); (iii) Suratgarh – Anupgarh comprising the section from Suratgarh to Anupgarh (the “Highway-III”) ; (iv) Jodhpur – Balesar – Shergarh comprising the section from Jodhpur to Shergarh (the “Highway-IV”) and (v) Hanumangarh – Sri Ganganagar comprising the section from Hanumangarh to Sri Ganganagar (the “Highway-V”) totalling 420 Kms. (the “Project”) through Public Private Partnership (the “PPP”) on Design, Build, Finance, Operate and Transfer (the “DBFOT”) basis. ” (Package-21)
  • Consultancy work for Feasibility studies for various options of ruling gradients and limiting curvatures using DEM/DTM, ttechno-economical comparison of various alternatives and deciding most suitable technical parameters for Final Location Survey of a single BG Railway line between (i) Bhalukpong- Tenga- Tawang & (ii) North Lakhimpur- Bame (Along)-Shilapathar in Arunachal Pradesh & Assam.
  • Preparation of Feasibility report for providing Railway Network in 1432 acres of land in North of Oil Jetty No.7 near Jafrawadi Bunder at KandlaPort “.and “Field survey for laying additional three lines of full rake length in vacant area near urea coating plant inside the Kandla Port
  • Detailed Project Report for proposed alignment for Manmad to Mhow/Indore project of approximate 352 Km
  • Preparation of Detailed Project Report of Rail Siding from New Dabla Station to the proposed Integrated Multimodal Logistics Hub (IMLH) at Nangal Chaudhary under Delhi-Mumbai Industrial Corridor (DMIC) Project
  • Control Point Confirmation Survey for the Mumbai-Ahmedabad High Speed Railway Project for Detail Design in India.

Airports

  • Review of The Conceptual Design of Phase 1, 11 And 111, Elaboration of the Integral Design of the Buildings, Air Side and Land Side at the Basic Level and Detail of Phases 1, Ll And Llll and Support During the Construction of works for the Extension of the Passenger Terminal of the International Airport the Golden Luis Carlos Galán Sarmiento of Bogotá”.
  • Design work corresponding to the Contract for the: “(i) Structuring, Design, Construction and supply of certain infrastructure at the Rafael Núñez International Airport in the city of Cartagena, (ii) the financing of all interventions and (iii) the operation and maintenance of the entire infrastructure of the Rafael Núñez International Airport in the city of Cartagena”
  • ATRP Terminal Building Improvements According to Functional Design. Seville Airport.”
  • Aeroporto Humberto Delgado – Pier Sul – Preparation Of Project Of Execution And Project Review, Deal-Ahd-002.11
  • Airport Expansion Project Jorge Ch~vez International – new Lim, Work Package 3: Terminal, Platform and Access.
  • Drafting of the Execution Project, Optional Management, Technical Assistance, Health and Safety Coordination and Quality Control of the work: New Distribution Center and preparation of orders Mayoral Moda Infantil S.A.U., located in former Intelhorce complex, Avenida Ortega y Gasset, s/n,
  • Technical Assistance for Drafting Increased Project for Runway 07L-25R.- Barcelona Airport.
  • Design corresponding to the contracts (i) Design of the different performances of the Airport Field Palmerola International, and (ii) Amended No. 1 to the design of the Different Performances of the Flight Field from the International Airport of Palmerola.
  • Design of the New Pavement for Track 02 – 20 of the Alfonso Bonilla Aragon International Airport of the City of Cali.
  • Comprehensive Study Tesa Rafael Pavon Airport Expansion.